Key stages in the manufacturing process start learning
|
|
Planning, Sequencing, Scheduling, Dispatching, Loading, Monitoring
|
|
|
Designing machines to do multiple tasks; reprogramming machine tools while they are running start learning
|
|
|
|
|
Tailoring products to meet the needs of a large number of individual customers start learning
|
|
|
|
|
internal technical standards, ISO 9000 family, Six Sigma start learning
|
|
|
|
|
Production process: work in progress without stopping start learning
|
|
proces ciągły
|
|
|
Production process: groups of products of the same type move through the process start learning
|
|
produkcja partiowa
|
|
|
Production process: low volume, opportunities for customisation start learning
|
|
produkcja jednostkowa
|
|
|
Types of production process start learning
|
|
continuous process, mass process, batch process, job production, project
|
|
|
introducing materials to an operation so it can begin start learning
|
|
|
|
|
authorising a task to begin start learning
|
|
|
|
|
bringing together customer demand with operational issues of volume, timing, materials, etc. start learning
|
|
|
|
|
checking progress and solving problems start learning
|
|
|
|
|
deciding when tasks should start and finish start learning
|
|
|
|
|
deciding which workstation will carry out which task in which order start learning
|
|
|
|
|
when equipment (or the whole line) stops working and production is lost start learning
|
|
czas przestoju
|
|
|
time between one job / batch finishing and the next one beginning (includes time taken to prepare machinery for the new process) start learning
|
|
czas zmiany
|
|
|
time required from receiving a customer order to final delivery; it includes order processing, pre-pack time, in-transit time, receiving and inspection start learning
|
|
okres realizacji zamówienia
|
|
|
time taken for a given job / batch to pass through all the operations needed start learning
|
|
|
|
|
extra hours that someone works, beyond their contractual obligation (and often paid at a higher rate) start learning
|
|
nadgodziny
|
|
|
time taken to prepare machinery and equipment for a new job / batch start learning
|
|
|
|
|
time required from the initial concept for a new product to when it first goes on sale start learning
|
|
czas wprowadzenia produktu (na rynek)
|
|
|
any period of delay between one event and another (e.g. between giving an instruction and the operation beginning) start learning
|
|
czas zwłoki
|
|
|
A specific problem that causes delays to a whole process is called a... wąskie gardło start learning
|
|
A specific problem that causes delays to a whole process is called a 'bottleneck'
|
|
|
The amount of work that can be dealt with in a particular time period is the... start learning
|
|
The amount of work that can be dealt with in a particular time period is the 'throughput'
|
|
|
Actual output divided by potential output is ... (e.g. room occupancy rates in a hotel) start learning
|
|
Actual output divided by potential output is 'capacity utilisation' (e.g. room occupancy rates in a hotel) wykorzystanie mocy produkcyjnych
|
|
|
A product that serves its intended function, without any extra features, is described as... start learning
|
|
A product that serves its intended function, without any extra features, is described as 'fit-for-purpose' dostosowany do potrzeb, odpowiadający potrzebom
|
|
|
If a product has good quality in relationship to its price, then it is... start learning
|
|
If a product has good quality in relationship to its price, then it is 'good value-for-money' towar wart swojej ceny
|
|
|
The characteristic of 'always working well' is... start learning
|
|
The characteristic of 'always working well' is 'reliability'
|
|
|
The characteristic of 'lasting a long time' is... start learning
|
|
The characteristic of 'lasting a long time' is durability
|
|
|
A fault in the way something is made is a... start learning
|
|
A fault in the way something is made is a 'defect'
|
|
|
requiring a lot of finance start learning
|
|
|
|
|
requiring a lot of manpower start learning
|
|
|
|
|